Selly Oak 5

Issues:

  • Needs a cycle path to take cyclists across the absurdly bloated Harborne Lane.
  • Connectivity of the Harborne Lane cycle path with Vincent Drive.
  • Design of the junction outside The Barberry.
  • Design of the shared use paths and car-centric infrastructure that forces cyclists to use a busy gyratory system to avoid cycling through bus shelters. This also results in cyclists heading for Vincent Drive having to make a weird right turn on to a shared-use path, something motorists don't expect.

Geolocation: 

Location type: 

Region: