Leith Links (1)

Leith Links (1)
At the Craigentinny end of the Portobello promenade the C2C cycle route (www.uppertweed.railwaypaths.org.uk) joins a shared-use footway, despite there being plenty of space to do the job properly. However, this section is not very long, and after crossing the A199 the route joins split-use footpaths that connect Seafield Street to this point on Links Gardens. Here a build-out has been built to narrow the road where cyclists cross to this brand new split-use path. It's not especially wide, but it has been built with machine-laid bitmac, so it is nice and smooth.

Tags: