Image 1.JPG

End of Route sign on Temple Row
This is at location 1. This sign is confusing as at the consultation the pavement on the right, leading to Corporation Street, was supposed to be shared-use pavement cycling. The justification for this was that the pavement had ample width for cycles and pedestrians to share.

Tags: